South College to be closed for waterline replacement

The Bowling Green Water Distribution and Wastewater Collection Division will be closing South College Avenue from Clough Street to East Wooster Street beginning Dec. 5 through Dec. 7. Each day, the road will close at 7:30 a.m. and reopen at 3 p.m. Residents will have access to driveways throughout this closure. This closure is required for the replacement of a water line.

Questions about this project may be directed to the Water Distribution and Wastewater Collection Division at 419-354-6277.