Columbia Gas outlines more downtown work

Columbia Gas of Ohio has provided the City of Bowling Green with the following tentative work schedule for the continued installation of the natural gas line installation occurring downtown.

On Aug. 23-25:
• Alley north of the 100 block of West Wooster between Frontier Communications and China Village for natural gas main line installation. Service line installation is scheduled to occur along the 100 block of West Wooster.

On Aug. 27-31:
• East Wooster – natural gas service line installation.
• Alley north of the Police Division for main line installation.
• West Washington closure – between Main and the U.S. Post Office to install
natural gas main line along the north side of the street.

Questions about the Columbia Gas project should be directed to Raquel Colon, External Affairs Specialist for Columbia Gas. Colon may be reached at
rcolon@nisource.com or 419-539-6206.