The City of Bowling Green Water Distribution and Wastewater Collection Division will be replacing a sewer lateral on South Summit Street, between Clough and Lincoln streets on Oct. 4 and 5. As a result, this section of South Summit will be closed to traffic from 7:30 a.m. to 3:30 p.m. each day and parking will be prohibited. The sidewalk in front of the work zone will also be closed to pedestrian traffic.